MOST RECENT VIDEOS
- Sort by:
- Most Popular
- Most Recent
Showing all videos (Page 3)
-
00:51 Using GPS Technology in Construction of the New Hardy Elementary School
Site-work is underway for construction of the new Hardy Elementary School. M. B. Kahn Construction Company and Heartland Construction will complete the first phase of grading in record time by replacing the traditional process of surveying and staking with GPS technology. The GPS system provides specific information to the equipment operator on how much they will need to cut or fill in relation to their position on the field. The process will save hundreds of man-hours while also reducing fuel costs. As part of the site preparation, crews are creating a retention pond, which, along with silt fences, will help control run-off from the property. The companies expect to begin laying the foundation for the school around February 15, as long as the weather cooperates. The new, two-story facility will be over 100,000 square feet and house students in grades Pre-kindergarten through fourth grade. The project is slated for completion in the spring of 2023.
Uploaded Jan 28, 2022 to Facilities, Construction, & Maintenance -
1:31 A Student's Reflection
Carrsville Elementary School 5th grader, Keli Square reflects on Martin Luther King Jr. and how his legacy and words resonate with Keli and his peers even today. Keli wrote and performed his original composition in honor of MLK Day 2022.
Uploaded Jan 28, 2022 -
Steering Education in the Right Direction
On September 21, 2021, IWCS began the process of developing the 2022-2027 Strategic Plan. As part of the process for including community voice and ensuring co-authorship of the IWCS Strategic Plan, a steering committee was formed to unpack the current strategic plan, review diverse examples of strategic plans, and brainstorm new strategic goals. The committee, consisting of parents, students, teachers, administrators, and more, came together at the Smithfield Center and began charting the course for the future of IWCS.
Uploaded Jan 28, 2022 to About Us -
00:30 Different Look, Same Great School
This video, created by Smithfield High Senior Alexandra Grossman, won 2nd place in the 2020 Virginia School Board Association's (VSBA) ninth annual student video contest. The contest challenged high school students across Virginia to create a 30-second video around the theme of “How Virtual Learning Changed My School Year.” Alexandra’s entry, “Different Look, Same Great School,” highlights how being a student in 2020 Smithfield High School looks different from last year for her and her classmates. Videos were judged on how well they addressed the topic, the quality of the production of the video, as well as the depth of thought and creativity of the video. The contest was open to Virginia public high school students and one entry per school division was accepted.
Uploaded Dec 07, 2020 - Building Better Houses and Relationships Uploaded Apr 01, 2019
- The Agricultural Land Lab at IWCS Uploaded Apr 01, 2019
- Building Trades Program Uploaded Apr 01, 2019
- Cosmetology Program Uploaded Apr 01, 2019
- Welding Program Uploaded Apr 01, 2019
- Culinary Arts Program Uploaded Apr 01, 2019